What to send a structural engineer before asking for a fee proposal

Send the architectural drawings, a site address and survey, any soil or geotechnical report, the intended use and loads, and a clear statement of what you want the engineer to deliver and by when. With those, an engineer can price the real scope; without them, the proposal has to carry allowances and exclusions that turn into variations later.

Procurement · 21 November 2026

Why the brief decides the price

A structural fee is built from hours, and hours depend on how much the engineer has to find out before designing. A one-line request such as "engineering for a new pool" can mean a standard shell on a flat Class M site or a pool beside a sewer, a sleeper wall and the neighbour's house. The engineer either prices the worst case or prices the simple case with a long list of exclusions.

Clients who send a complete package usually receive a tighter fee, fewer exclusions and a faster start. The list below covers residential, aquatic and commercial work. Not every item applies to every project, so send what you have and say what is missing.

1. The site

Start with the full street address and lot and plan number. The engineer uses these to check council overlays such as flood, landslide or acid sulfate soils, and to look for sewer and water mains that bring QDC MP 1.4 into play.

  • Address, lot and plan number
  • Contour or detail survey if one exists, with levels to a known datum
  • Location of existing buildings, retaining walls and boundary fences, ideally on the survey
  • Photos of the site, including any slopes, cracks in existing structures and access for machinery
  • Sewer and stormwater as-constructed information from the service provider, if you have it

2. Ground information

Footing, pool and retaining wall design depend on the soil. For houses and pools, the soil test report gives the site classification under AS 2870 and the bearing capacity. For larger buildings, a geotechnical investigation gives design parameters for footings, piles and earth pressures.

If no report exists, say so. The engineer can include commissioning one in the proposal or design on a stated assumption that must be confirmed before construction. Designing on an assumption saves a week at the start and can cost far more if the assumption turns out wrong at excavation.

3. Drawings and the design you want engineered

Send the latest architectural set, including plans, elevations and sections, and say which revision it is. For a pool, the pool builder's plan with dimensions, depths, steps, spa and equipment locations does the same job. For alterations, include any drawings of the existing building, even old ones.

Mark anything that is not yet settled. An engineer can work with a design in progress, but needs to know which parts are fixed so the fee covers realistic redesign.

4. Loads and use

Engineers design for the loads the building will carry. Tell them about anything outside normal domestic or office use: storage racking, forklifts, cranes, plant on the roof, heavy medical or kitchen equipment, a green roof, a rooftop pool, vehicle access or a future extra storey.

For industrial slabs, the racking layout with leg loads and the forklift model with wheel loads are the two pieces of information that most change the design.

5. The scope and deliverables

State what you need to receive. Typical deliverables include structural drawings, a design certificate for the building certifier (Form 15 in Queensland), computations if the certifier asks for them, and site inspections at stages such as footing excavation or pre-pour reinforcement (with Form 16 inspection certificates where required).

Say who else is on the team. If an architect, hydraulic engineer, pool builder or geotechnical engineer is engaged, the structural engineer coordinates with them rather than duplicating their work. Note anything you expect from the engineer that is often excluded, such as civil stormwater design, underpinning of neighbouring footings or temporary works.

6. Programme and approvals

Give the date you need documents for building approval, tender or construction, and whether the project needs council approval as well as building approval. A realistic date lets the engineer plan the work and tells you early if it cannot be met.

If the project is in Queensland, the engineer who certifies the design must be a practising Registered Professional Engineer of Queensland or work under the direct supervision of one. Asking for the RPEQ number in the proposal is a reasonable step, and you can check it on the BPEQ public register.

A short checklist

Copy this into your request and attach what you have:

  • Site address, lot and plan, and survey
  • Soil test or geotechnical report, or a note that none exists
  • Architectural or pool builder drawings with revision
  • Unusual loads and the intended use
  • Required deliverables: drawings, Form 15, inspections
  • Other consultants on the project
  • Target dates for approval, tender and construction
  • Known constraints: sewers, easements, neighbouring structures, flood or landslide overlays

What happens next

With this information the engineer can confirm the scope, list any assumptions and price the work. Expect questions back on anything that changes the structure, such as a wall that may be removed later or a pool that might move. Answering them before the fee is agreed is the cheapest point in the project to do it.

When comparing proposals from several engineers, compare the scope as well as the fee. Check whether each one includes site inspections, the Form 15, coordination with other consultants and a set number of design revisions. A lower fee that excludes inspections or revisions can cost more by the end of the job.

General information for Queensland projects, not advice for a specific site. Written by Coreline Engineering; engineering for a project is carried out or supervised by Mustafa Koc, RPEQ 35981.

Sources

Have a project that needs engineering input?

Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.

Registered engineer
Mustafa Koc, RPEQ 35981 (Civil)
Add company, role and timing (optional)

We use these details only to respond to your enquiry. See our privacy policy. Please do not attach or paste plans here; we will ask for them by email once we have spoken.

Call 1300 924 666Discuss your project