Stormwater and drainage design

We prepare stormwater and drainage plans for houses, duplexes and small developments, including discharge to a lawful point, and cut-and-fill plans for site earthworks. Drainage is designed alongside the slab and retaining because water is the main cause of footing and wall problems.

Housing engineering

Typical projects

  • New houses needing a stormwater plan for approval
  • Sloping sites draining away from the street
  • Duplex and small unit developments
  • Cut-and-fill earthworks for building platforms

Problems this work solves

Lawful point of discharge
Stormwater must go to a lawful point, such as the kerb or a council drain. Lots that fall away from the street may need easements or alternative solutions.
Water against the slab
Ground that falls towards the house lets water pond against the slab edge, wetting reactive clay and driving movement.
Cut and fill balance
Earthworks create retaining and drainage needs. Balancing cut and fill keeps costs and wall heights down.

What our engineering covers

Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.

  • Roof and site stormwater design
  • Lawful point of discharge assessment
  • Pipe sizing and pit layout
  • Cut-and-fill and site grading plans
  • Coordination with slab and retaining design

Design considerations

Council requirements
Councils set their own stormwater requirements. Designs follow the requirements of the relevant council.
Tanks
Rainwater tanks reduce runoff but still need an overflow to a lawful point.
Overland flow
Sites in overland flow paths need floor levels and drainage designed to keep water away from the house.

What you typically receive

The exact deliverables are set in the fee proposal for each project.

  • Pipe and pit schedule with invert levels
  • Stormwater and drainage plan
  • Cut-and-fill plan
  • Design certificate where required

What to send us

  • Soil test, where infiltration or soakage is proposed
  • Site survey with levels and contours
  • House or development plans
  • Council and lot details
  • Existing stormwater connections

Standards and regulations that usually apply

Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.

AS/NZS 3500.3
Design and installation of stormwater drainage on a property.
NCC (Building Code of Australia)
Performance requirements for buildings. In Queensland NCC 2022 applies until 30 April 2027 and NCC 2025 from 1 May 2027.

Questions we are asked

What is a lawful point of discharge?

It is a location where stormwater can legally be discharged, such as the kerb and channel, a council drain or an approved easement. The building approval requires stormwater to reach one.

My block slopes away from the street. Where does the stormwater go?

Options include an easement through a lower neighbour's land, a council drain at the rear or, in some cases, an alternative approved solution. The council's requirements decide what is acceptable.

Do I need a cut-and-fill plan?

Most sloping sites need one for approval, showing existing and finished levels and where retaining is needed.

Sources

Need stormwater and drainage design?

Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.

Registered engineer
Mustafa Koc, RPEQ 35981 (Civil)