Aquatic facility assessments
We audit existing pools and aquatic centres: the shell, plant room, hydraulics, water treatment and surrounds. The report tells an owner what condition the facility is in, what does not meet current requirements, what to fix first, and what to budget over the coming years.
Aquatic engineering
Typical projects
- Council aquatic centres and community pools
- School and university pools
- Body corporate and hotel pools
- Facilities being bought, leased or refurbished
Problems this work solves
- Ageing plant
- Older filtration and pumping plant often still runs but uses far more energy and treats water less effectively than current equipment.
- Hidden shell problems
- Leaks, concrete cancer and failed joints are often visible only when the pool is drained. Planning an audit around a scheduled shutdown gives the clearest picture.
- Changed requirements
- Requirements for access, barriers and public pool operation have moved since many facilities were built. An audit separates what must change from what is recommended.
What our engineering covers
Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.
- Inspection of shell, concourse, gutters, plant room and pipework
- Review of plant capacity against current bather load
- Water treatment and disinfection review
- Identification of compliance gaps
- Prioritised capital works and maintenance plan
- Leak and defect investigation where needed
Design considerations
- Audit timing
- Auditing during a planned drain-down lets the shell be inspected directly and avoids a second shutdown.
- Asset life
- Ranking components by remaining life lets an owner plan replacements across budget years.
- Refurbish or replace
- Sometimes the shell is sound and only plant needs replacing; sometimes the reverse. The audit gives the evidence to make that call.
What you typically receive
The exact deliverables are set in the fee proposal for each project.
- Condition and compliance report with photographs
- Prioritised list of works with indicative timing
- Asset register input for plant and structure
- Scope for refurbishment design where engaged
What to send us
- Facility drawings and plant records
- Maintenance and water test logs
- Known problems: leaks, water quality complaints, breakdowns
- Planned drain-down or shutdown dates
- Budget horizon for capital works
Standards and regulations that usually apply
Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.
- AS 3600
- Design and construction of reinforced and prestressed concrete structures and members.
- AS 1428.1
- Design for access and mobility, referenced by the NCC for accessible paths and entries.
- QDC MP 3.4
- Queensland's single pool safety standard for barriers. It does not cover the structural design of the pool shell.
- NCC (Building Code of Australia)
- Performance requirements for buildings. In Queensland NCC 2022 applies until 30 April 2027 and NCC 2025 from 1 May 2027.
Questions we are asked
How often should a commercial pool be audited?
Many owners audit before major budgets are set, before purchase or lease, and when plant nears the end of its life. An audit timed with a scheduled drain-down gives the most complete view of the shell.
Can a pool be assessed while it is full?
Plant, hydraulics, concourse and visible structure can be assessed with the pool full. The shell, joints and floor are best inspected drained, so we say in the report what could not be seen.
What does an aquatic facility audit cost?
It depends on the size of the facility and the depth of the question, so we quote after seeing the drawings and agreeing the scope.
Sources
Need aquatic facility assessments?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)