Engineering in Logan
Coreline Engineering provides structural, pool and residential engineering across Logan City, a short drive from its Rochedale office. Typical work includes footings and slabs for new homes in growth estates, pools, retaining walls on sloping lots and design on flood-affected land.
South East Queensland · ~25 km from Brisbane CBD
What changes the engineering in Logan
- Council-run water and sewerage
- In Logan the council itself provides water and wastewater services through Logan Water, so building over or near its mains is assessed under QDC MP 1.4 with Logan City Council as the service provider.
- Changing flood mapping
- Flood provisions in the Logan Planning Scheme have been affected by Temporary Local Planning Instrument No. 1/2024 since 6 March 2025, and in June 2026 council endorsed limiting the flood hazard overlay to the 1% AEP flood. Check the current mapping for the lot before design.
- Priority development areas
- The Logan Planning Scheme does not apply in the Yarrabilba and Greater Flagstone priority development areas, where Economic Development Queensland manages development. Estate covenants and engineering standards there can differ.
- Greenfield lots on cut and fill
- New estates often create level pads with cut and fill. Controlled fill, reactive clays and retaining between lots all influence site classification and footing design.
Common projects
- New house footings and slabs in growth estates
- In-ground pools
- Retaining walls between lots
- Sheds and secondary dwellings on acreage
- Small industrial and commercial buildings
Questions we are asked
Who approves building near a sewer in Logan?
Logan City Council provides the water and sewerage network through Logan Water, so it is the service provider for QDC MP 1.4 assessments. Your certifier will say whether a referral is needed.
Do the council's flood maps apply in Yarrabilba or Flagstone?
Those priority development areas are managed by Economic Development Queensland rather than the Logan Planning Scheme, so check the PDA development scheme and estate requirements for the lot.
Does a lot on fill need a different footing?
Often. Uncontrolled fill or deep fill can change the site classification, which may call for deeper edge beams, piers to natural ground or a stiffer slab. A soil test confirms it.
Sources
Have a project that needs engineering input?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)
