Footings and slabs
We design residential slabs and footings to AS 2870, using the site classification from your soil report. If the soil information is incomplete, we tell you what testing the site needs before design rather than designing to a guess.
Housing engineering
Typical projects
- New houses on reactive clay
- Houses on filled lots in new estates
- Sloping sites needing piers or split-level slabs
- Duplexes and small unit developments
- Extensions matched to existing slabs
Problems this work solves
- Reactive clay movement
- Clay swells when wet and shrinks when dry. On highly reactive sites the slab has to be stiff enough to ride that movement without cracking the house.
- Uncontrolled fill
- Fill without compaction records is classed as a problem site. Footings usually go through it to natural ground, often on piers.
- Trees and drainage
- Trees draw moisture from clay and poor drainage adds it. Both cause uneven movement that the design and site maintenance must address.
What our engineering covers
Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.
- Review of the soil report and site classification
- Advice on further testing where the report is incomplete
- Slab and footing system selection
- Design of waffle pod, stiffened raft or footing slabs
- Pier and edge beam design for fill and slopes
- Slab inspections before pour where engaged
Design considerations
- Waffle pod against stiffened raft
- Waffle pod slabs use less concrete and suit flat sites. Stiffened rafts handle steps and difficult ground more easily.
- Site classification drives cost
- Moving from an M to an H1 or H2 classification increases beam depth and steel. The classification is the largest single influence on slab cost.
- Plumbing under slab
- Leaking pipes under a slab on clay can cause heave. Plumbing details matter on reactive sites.
What you typically receive
The exact deliverables are set in the fee proposal for each project.
- Slab and footing drawings
- Design certificate for building approval
- Notes on site drainage and maintenance
- Pre-pour inspection where engaged
What to send us
- Soil report with site classification
- Site plan and contour survey
- House plans from the builder or draftsperson
- Details of fill, trees and existing structures
- Retaining requirements on sloping sites
Standards and regulations that usually apply
Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.
- AS 2870
- Site classification and the design of slabs and footings for houses, townhouses and similar buildings.
- AS 3600
- Design and construction of reinforced and prestressed concrete structures and members.
- NCC (Building Code of Australia)
- Performance requirements for buildings. In Queensland NCC 2022 applies until 30 April 2027 and NCC 2025 from 1 May 2027.
Questions we are asked
What do soil classifications like M, H1 and H2 mean?
They describe expected ground movement from moisture change: M is moderately reactive, H1 and H2 are highly reactive, and E is extremely reactive. Sites with fill, soft soils or other problems are classed P. The classification sets the slab type and stiffness under AS 2870.
Do you do soil testing?
No. A geotechnical firm carries out the testing. We tell you what testing is needed, review the report and design to it.
Why did my slab cost more than expected?
Usually because the site classification was more reactive, or fill was found, which increases beam depth, steel or adds piers. Getting the soil report early avoids surprises in the build price.
Sources
Need footings and slabs?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)