Steel fibre reinforced concrete slabs
We design steel fibre reinforced concrete (SFRC) ground slabs for warehouses, factories and other industrial floors, where fibres replace some or all of the conventional mesh. The design covers slab thickness, fibre dosage, joint layout and the point loads from racking and forklifts.
Structural engineering
Typical projects
- Warehouse and distribution centre floors
- Factory and processing floors with heavy plant
- Hardstands and external pavements
- Cold store and racking floors
Problems this work solves
- Racking leg loads
- High-bay racking puts concentrated loads on the slab through small base plates. Those point loads, not the average floor load, usually set the slab thickness.
- Joint damage
- Joints are where industrial floors fail first, through edge spalling under forklift wheels and curling at slab edges. Joint spacing and armouring are as important as the slab itself.
- Fibres are not a cure for everything
- Fibres control cracking and add post-crack capacity, but they do not replace all conventional reinforcement in every situation, for example over piles or where the slab is suspended.
What our engineering covers
Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.
- Assessment of racking, forklift, storage and plant loads with the operator
- Slab thickness and fibre dosage design
- Joint layout, joint type and armouring details
- Subgrade and sub-base requirements, read with the geotechnical report
- Comparison against a conventionally reinforced slab where useful
- Specification for fibre type, mix and finishing
Design considerations
- Speed of placement
- Removing mesh lets concrete be placed by laser screed without steel fixing, which can shorten the floor programme on large slabs.
- Supplier design data
- SFRC performance depends on the specific fibre product and dosage. Design values have to be backed by test data for that product.
- Future use
- A floor designed for today's racking may be overloaded when the tenant changes. Stating the design loads on the drawings protects the owner later.
What you typically receive
The exact deliverables are set in the fee proposal for each project.
- Slab design drawings with thickness, joint layout and details
- Fibre and concrete specification
- Design load schedule for the owner's records
- Design certification where required
What to send us
- Floor layout with racking type, height and leg loads if known
- Forklift or vehicle types and wheel loads
- Geotechnical report for the subgrade
- Floor flatness or finish requirements
- Programme and the builder's preferred placement method
Standards and regulations that usually apply
Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.
- AS 3600
- Design and construction of reinforced and prestressed concrete structures and members.
- AS/NZS 1170 series
- Structural design actions: permanent, imposed, wind, earthquake and other loads used in every structural design.
Questions we are asked
Can steel fibres replace mesh in a warehouse slab?
In many ground-bearing warehouse slabs they can replace mesh completely, provided the design is based on test data for the chosen fibre and dosage. Suspended slabs, slabs over piles and some edge and joint zones may still need conventional bars.
What information do you need about racking?
We need the racking type, height, number of levels, maximum pallet weight and base plate size, or the leg loads from the racking supplier. Leg loads are the most useful single figure.
Do fibre slabs crack less?
Fibres hold cracks together after they form and spread cracking more evenly, which keeps crack widths smaller. They do not prevent shrinkage cracking on their own, so joint spacing, curing and the mix still matter.
Need steel fibre reinforced concrete slabs?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)