Foundation design
We design foundations for buildings, pools and structures on difficult ground, including reactive clay, uncontrolled fill, slopes, rock and sites next to existing buildings or sewers. Options range from pad and strip footings and rafts to bored piers and screw piles, chosen from the geotechnical findings.
Structural engineering
Typical projects
- Commercial and industrial buildings on reactive or filled ground
- Extensions next to existing footings
- Structures near sewers, water mains and stormwater drains
- Sloping and rock sites
- Pools and tanks with uplift or groundwater issues
Problems this work solves
- Existing footings nearby
- Excavation for a new footing or a pool can undermine a neighbouring footing if it extends below that footing's zone of influence. The geometry has to be checked, and underpinning or a deeper design adopted where it does.
- Fill and soft ground
- Uncontrolled fill can settle unevenly for years. Footings are usually taken through it to natural ground, which changes the system and the cost.
- Building near infrastructure
- Footings within the clearances of a sewer, water main or stormwater drain trigger QDC MP 1.4 and may need the service provider's approval.
- Uplift and groundwater
- Basements and empty pools can float when groundwater is high. The foundation has to hold them down or relieve the pressure.
What our engineering covers
Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.
- Review of the geotechnical report and identification of any gaps
- Selection and comparison of foundation systems for the site
- Design of pads, strips, rafts, bored piers and screw pile layouts
- Checks against existing footings and load influence zones
- Design for MP 1.4 clearances and service provider submissions
- Inspection of founding conditions and pier excavations
Design considerations
- Bored piers against screw piles
- Bored piers suit stiff clay and rock and are cheap where a rig can get in. Screw piles install quickly with small machines and carry load immediately, which suits tight access and soft ground.
- Geotechnical information drives cost
- Too little site investigation leads to conservative design. Spending more on investigation often reduces the foundation cost on larger sites.
- Design load against performance-based piles
- Screw piles are often specified by a required working load, with the piling contractor responsible for achieving it. The drawings must state the load clearly and how it will be verified.
What you typically receive
The exact deliverables are set in the fee proposal for each project.
- Foundation drawings with footing or pile layouts and details
- Founding level and bearing assumptions stated on the drawings
- Load schedules for pile contractors
- MP 1.4 documentation where relevant
- Inspection certificates for founding inspections we carry out
What to send us
- Geotechnical report or soil test, with borehole logs
- Site survey with levels, boundaries and existing structures
- Location of sewers, water mains and stormwater on or near the lot
- Architectural or structural drawings showing column and wall loads
- Photos of neighbouring structures close to the works
Standards and regulations that usually apply
Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.
- AS 2159
- Design and installation of piles, including bored piers and screw piles.
- AS 2870
- Site classification and the design of slabs and footings for houses, townhouses and similar buildings.
- QDC MP 1.4
- Building work over or near sewers, water mains and stormwater drains, including clearances and service provider approval.
- AS/NZS 1170 series
- Structural design actions: permanent, imposed, wind, earthquake and other loads used in every structural design.
Questions we are asked
Can I build over or near a sewer in Queensland?
Sometimes, under QDC MP 1.4. Work within set clearances of a sewer, water main or stormwater drain needs to meet MP 1.4 and may need the service provider's approval. The footings are usually taken below the zone of influence of the pipe.
When are screw piles a better choice than bored piers?
Screw piles suit tight access, soft or wet ground and jobs where load is needed straight away, because they install with small machines and need no concrete curing. Bored piers are usually cheaper where a rig can reach and the ground is stiff clay or rock.
Do I need a geotechnical report before foundation design?
Yes, for almost all structures. The report tells us the soil profile, bearing capacity, reactivity and groundwater. Without it the design has to assume the worst, which is usually more expensive than the investigation.
Sources
Need foundation design?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.