Multi-residential and mid-rise
Multi-residential projects run on tight margins, so the structure has to be efficient to build and repeatable from unit to unit. Coreline provides structural design for townhouse developments, walk-up apartments and mid-rise buildings, including footings, retaining, slabs and frames.
Sector
Projects in this sector
- Multi-residential and mid-rise
- Townhouses
- Walk-up apartments
- Housing estates and small subdivisions
What clients in this sector worry about
- Construction cost per unit
- Developers measure the structure in dollars per square metre of saleable area. Repetition, simple formwork and consistent details make the biggest difference.
- Sloping and constrained sites
- Infill sites in South East Queensland are often steep, narrow or crossed by sewers. Retaining, site cut and footing design decide how many units fit.
- Acoustic and fire separation
- Walls and floors between dwellings must meet NCC fire and sound requirements. The structural system has to deliver those ratings without extra layers.
- Defect risk after handover
- Cracking, water ingress through slabs and movement at balconies are common complaints in strata buildings. Detailing and construction inspection reduce that risk.
Engineering considerations
- Townhouses and attached housing
- Townhouse footings follow residential practice and AS 2870 site classification, but party walls, shared retaining and stormwater across the lot need to be designed as one scheme.
- Apartment floor systems
- Post-tensioned flat plates, conventionally reinforced slabs and precast planks each suit different spans and builders. The choice affects programme and how freely services can penetrate later.
- Basements and podiums
- Car parking under apartments brings retaining walls, ramps, groundwater and transfer of residential columns onto the parking grid.
- Stormwater and site drainage
- Council conditions often require on-site detention and lawful point of discharge. Civil drainage design is coordinated with the structure and landscaping.
Questions we are asked
Do townhouses use the same footing standard as a single house?
AS 2870 covers footing systems for single dwellings, townhouses and similar buildings. Larger or more complex buildings move into engineered design under AS 3600 and the loading standards.
Is post-tensioning worth it for a four-storey apartment building?
It depends on spans, the builder's experience and the programme. Post-tensioned slabs are thinner and allow longer spans, while conventional slabs are simpler to alter later, so the options are compared at concept stage.
Who designs on-site stormwater detention for a unit development?
A civil engineer designs it to meet the council's development conditions, sizing tanks or basins and the outlet so flows leaving the site stay within the permitted rate.
Sources
Have a project that needs engineering input?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)