Commercial pool engineering
We engineer commercial pools for hotels, schools, apartment buildings, clubs and councils: the concrete shell and its foundations, the plant room, circulation hydraulics and the water treatment system. The pool is designed as one facility, so the structure, plant and operating costs are decided together.
Aquatic engineering
Typical projects
- Hotel and resort pools, including rooftop and podium pools
- School and university pools
- Body corporate and apartment pools
- Club and council lap and program pools
- Leisure pools with beaches, zero-depth entries and features
Problems this work solves
- Bather load sets the plant
- Filtration and disinfection capacity is sized on how many people use the pool at peak, not on its volume alone. Undersized plant shows up as cloudy water and chemical complaints on busy days.
- Pools on suspended structures
- Rooftop and podium pools add large, permanent water loads and need watertight detailing over occupied space. The building structure and pool shell have to be designed together.
- Running costs
- Pumping and heating are a facility's largest ongoing energy costs. Pipe sizing, pump selection and heat retention decided at design stage fix those costs for decades.
- Approvals for public pools
- Commercial and shared pools are public swimming pools in Queensland, with requirements beyond those of a private pool. The design has to support those approvals from the start.
What our engineering covers
Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.
- Concept options for pool configuration, depth profile and circulation
- Structural design of the shell, balance tank and foundations
- Plant room layout and equipment selection criteria
- Hydraulic design of inlets, outlets, skimmers or wet-deck gutters and pipework
- Filtration, disinfection and heating system design
- Coordination with architect, building structure, services and certifier
- Construction-phase inspections where engaged
Design considerations
- Skimmer against wet-deck
- Skimmer pools are simpler and cheaper. Wet-deck (deck-level) pools remove the surface layer more evenly, which helps water quality under heavy use, but they need a balance tank and more complex hydraulics.
- Plant room access
- Chemical deliveries, filter media changes and pump replacement all need practical access. A plant room squeezed into leftover space costs the operator time every week.
- Accessible entry
- Ramps, stairs with rails and hoists affect the shell geometry and must be fixed before structural design is complete.
What you typically receive
The exact deliverables are set in the fee proposal for each project.
- Pool structural drawings and certification
- Plant room layout and hydraulic schematics
- Equipment and water treatment specification
- Design report covering bather load, turnover and treatment basis
- Inspection certificates for inspections we carry out
What to send us
- Architectural layout and the intended use of the pool
- Expected peak number of swimmers and opening hours
- Site constraints: structure below, groundwater, access
- Geotechnical report for in-ground pools
- Operator preferences for chemicals, heating and plant brands, if any
- Approval stage and certifier details
Standards and regulations that usually apply
Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.
- AS 3600
- Design and construction of reinforced and prestressed concrete structures and members.
- AS 3735
- Concrete structures that retain liquid, covering crack control, cover and watertightness.
- AS 1428.1
- Design for access and mobility, referenced by the NCC for accessible paths and entries.
- QDC MP 3.4
- Queensland's single pool safety standard for barriers. It does not cover the structural design of the pool shell.
- NCC (Building Code of Australia)
- Performance requirements for buildings. In Queensland NCC 2022 applies until 30 April 2027 and NCC 2025 from 1 May 2027.
Questions we are asked
What is the difference between engineering a commercial pool and a backyard pool?
A commercial pool carries far more swimmers, so filtration, disinfection, turnover and hydraulic design become major engineering tasks alongside the shell. It is also a public swimming pool in Queensland, with approval and operating requirements a private pool does not have.
Can you design a pool on a rooftop or podium?
Yes. A rooftop pool needs the building structure designed for the water load, a watertight shell over occupied space, and access for plant and maintenance. Early coordination with the building's structural engineer is essential.
Do you build the pool or supply the equipment?
No. Coreline is the engineering consultant. We design and specify, and the pool contractor builds and supplies to our documents, which keeps our equipment recommendations independent of any supplier.
Sources
Need commercial pool engineering?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)